Loading... Please wait...
  • Air Compressor - Portable SWMS

Safe Work Method Statement - Air Compressor (portable) SWMS 10


Brand: SafetyCulture

Instant Download

Product Description

Air Compressor (Portable) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a fully comprehensive 15 page document that provides the outlines for the safety steps, general hazards and controls associated with the operation of a petrol / diesel or electric powered Air Compressor.

Ready to Use
Ensure that you save time with our pre-filled, fully customisable templates. All you need to do is add your company details, ABN, and make sure to include any site specific details or risks ensuring it is specific to the task being performed. It is then ready for printing and inclusion in your overall WHS System.

Air Compressor (Portable) SWMS Content:

High Risk Construction Work
Mobile Plant
Risk Assessment Matrix
Hierarchy of Controls
Job Steps (includes potential hazards and control measures)
Planning & Preparation
Training and Capabilities
Transporting the portable air compressor to/from site
Assess onsite conditions
Work area set up
Operating the air compressor
Working with hazardous materials
Refuelling on site
On Completion
Emergency Response Procedures
Legislative References
Employee sign off section
Review & Monitoring


This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.