Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Awnings, Blinds & Curtains Installation SWMS

Safe Work Method Statement - Awnings Blinds Curtain Installation SWMS 10

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Awnings - Blinds - Curtains Installation Safe Work Method Statement (SWMS)
This SWMS covers general issues associated with the installation of window accessories which include awnings, blinds and curtains – this SWMS covering both exterior and interior works. This SWMS also includes installation works on construction sites and existing domestic dwellings.

 

Ready to Use
Ensure that you save time with our pre-filled, fully customisable templates. All that is required of you is to add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task being performed. It is then ready for printing and inclusion in your overall WHS System.

 

Awnings - Blinds - Curtains Installation SWMS Content:


High Risk Construction Work
Moving Plant
Involves a risk of a person falling more than 2m, including work on telecommunication towers
Risk Assessment Matrix
Hierarchy of Controls
PPE
Job Steps (includes potential hazards and control measures)
Planning & Preparation
Training & Capabilities
Assess on site conditions
Work area set up
Install mounting brackets/hard ware
Using Power tools
Mounting canopy/blind/rod/curtain and cords/chains
Remote and/or isolated work
On Completion
Emergency Response Procedures
Formal Training, Licences, Supervisory Arrangements, Permits Required
Legislative References
Employee sign off section
Review & Monitoring

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.