Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Cleaning - Offices SWMS

Safe Work Method Statement - Cleaning (offices) SWMS 10

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Cleaning - Offices Safe Work Method Statement
This Safe Work Method Statement (SWMS) is a fully comprehensive document that outlines the safety steps, general hazards and controls associated with cleaning office spaces.

Ready to Use
Ensure you save time with our pre-filled, fully customisable templates. All you need to do is add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task being performed. It is then ready for printing and inclusion in your overall WHS System.

Cleaning - Offices SWMS Content:
Hazardous Work
Hazardous Manual Tasks
Noise
Use of electrical plant, equipment, appliances fixtures or fittings
Falls from height, one level to another, on the same level (inc. slips and trips)
Noise
Working remotely or in isolation
Hazardous chemicals/substances
Risk Assessment Matrix
Hierarchy of Controls
PPE
Job Steps (includes potential hazards and control measures)
Planning, preparation & site assessment
Assess onsite conditions
Set up work area with equipment
Empty rubbish bins
Restrooms
Dusting tables, desks, shelves and light fittings etc
Vacuuming
Cleaning lifts
Mopping
On Completion
Emergency Response Procedures
Legislative References
Employee sign off section
Review & Monitoring

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.