Loading... Please wait...
  • Tilt-up Panels Cast Onsite

Safe Work Method Statement - Concrete Tilt-Up (precast panels) SWMS 10


Brand: SafetyCulture

Instant Download

Product Description

Concrete - Tilt-up Panels (precast panels) Safe Work Method Statement
This Safe Work Method Statement (SWMS) is a fully comprehensive document that outlines the safety steps, main hazards and controls associated with the general safety of carrying out work that involves the casting of tilt-up / precast concrete panels. This includes formwork, steel fixing and concrete works.

This SWMS does not cover the lifting of tilt-up / precast panels into place.

Ready to Use
Ensure that you save time with our pre-filled, fully customisable templates. All you need to do is add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task being performed. It is then ready for printing and inclusion in your overall WHS System.


Concrete - Tilt-up Panels (precast panels) SWMS Content:
High Risk Construction Work
Mobile Plant
Tilt up or pre-cast concrete
Risk Assessment Matrix
Hierarchy of Controls
Job Steps (includes potential hazards and control measures)
Planning & Preparation
Temporary Casting Bed-Design
Concrete Panel Design
Training and Capabilities
Assess onsite conditions
Work area set up
Laying temporary Casting beds
Erecting formwork
Powder actuated tools
Applying bond breakers / release agents
Setting steel reinforcement / lifting
Tying steel reinforcement
Placing and finishing concrete
Using troweling machine while finishing concrete
Removing / stripping formwork
On Completion
Emergency Response Procedures
Legislative References
Employee sign off section
Review & Monitoring

This document has been developed by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers in Australia. SafetyCulture employ former WorkSafe Inspectors to research and author documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states in Australia for both Commercial and Residential Construction Work. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.