Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Hydro-Excavation Truck SWMS  Image Source: R & T Trenching, Water Blasting and Excavations

Safe Work Method Statement - Excavation (hydro) Truck Operation

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Hydro Excavation Safe Work Method Statement
This SWMS covers general hazards associated with the operation for truck mounted hydro excavation. Please be aware that this includes use of the truck, including pre-start and operational use, traffic and pedestrian control, and use of pressurised equipment. This SWMS also includes a Hydro Truck Pre Start Checklist

Ready to Use
Ensure that you save time with our pre-filled, fully customisable templates. All you need to do is add your company details, ABN, and include any site specific details or risks ensuring that it is specific to the task bering performed. It is then ready for printing and inclusion in your overall WHS System.

Hydro Excavation SWMS Content:
High Risk Construction Work
Mobile Plant
Work carried our adjacent to a road, railway or shipping lane, traffic corridor
Risk Assessment Matrix
Hierarchy of Controls
PPE
Job Steps (includes potential hazards and control measures)
Planning & Preparation
Training and Capabilities
Pre start check
Truck Operation
Obtaining Water from Hydrant or other water source e.g. creek/dam
Assess onsite conditions for operations
Manhole / pit safety
Pumps
Hydro Jetting
Vacuum Operation
Unloading / Emptying Truck
Refuelling
On Completion
Truck Roll Over Emergency Response
Hydro Truck Pre-Start Checklist
Emergency Response Procedures
Legislative References
Employee sign off section
Review & Monitoring

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.