Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Glass Handling SWMS

Safe Work Method Statement - Glass (transport - handling)

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Glass - Transport - Handling Safe Work Method Statement
This SWMS is a fully comprehensive document that covers general safety issues involved with the handling of glass, including the transport of glass sheets to/from sites, storage on site and general safe handling while on site and during installation.

Ready to Use
Ensure that you save time with our pre-filled, fully customisable templates. All you need to do is add your company details, ABN, and include any site specific details or risks ensuring that it is specific to the task being performed. It is then ready for printing and inclusion in your overall WHS System.

Glass - Transport - Handling SWMS Content:

High Risk Construction Work
Mobile Plant
Risk Assessment Matrix
Hierarchy of Controls
PPE
Job Steps (includes potential hazards and control measures)
Planning & Preparation
Training and Capabilities
Transporting to/from sites
Assess onsite conditions
Unloading & storage of glass at site
Emergency Response - Cut or laceration
On Completion
Emergency Response Procedures
Legislative References
Employee sign off section
Review & Monitoring

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.