Loading... Please wait...
  • Auger - Handheld SWMS

Auger - Handheld SWMS


Brand: SafetyCulture

Instant Download

Product Description

The Auger Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps for thenormal operation of hand held petrol driven Augers. These Augers are also commonly referred to as an Earth Auger.

This SWMS does not cover the use of an Auger attached to a tractor. Dedicated SWMS should be developed for these tasks, and for any risks not covered in this SWMS.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Refuelling
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References 

This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

Related items: 

  • Manual Handling – Hazardous Manual Tasks
  • Plant & Machinery – working around
  • Fuel storage, handling & decanting


This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.