Loading... Please wait...
  • Catering Equipment - Repairs SWMS

Catering Equipment - Repairs SWMS


Brand: SafetyCulture

Instant Download

Product Description

The Catering Equipment Repairs - Commercial Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure outlining the safety steps for the repair of commercial catering equipment.

The Catering Equipment - Repairs Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers general hazards associated with repair, service and maintenance of commercial grade catering equipment (such as ovens/dishwashers etc) at the catering premises on ground level.

Electrical works must not be conducted on live electrical installations unless deemed necessary. Ensure all persons have appropriate licenses for prescribed works (gas or electric) as relevant

Main hazards:

  -  Electric shock
  -  Exposure to hazardous atmosphere (gas)
  -  Musculoskeletal Disorder (MSD) from hazardous manual tasks
  -  Slips, trips

A dedicated SWMS must be developed for hazards not covered in this SWMS involving high-risk work (such as asbestos removal, work at heights, or works on live electrical installations).

The Catering Equipment - Repairs Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Catering Equipment - Repairs SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • 13 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • LOTO – Lock Out Tag Out
  • Working around electricity
  • Ladders

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.