Loading... Please wait...
  • Drivers Manual Work Method Statement

Drivers Manual

$195.00

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Driver Manual is suitable for:

  • Heavy Vehicle Drivers
  • Courier Drivers
  • Truck Drivers
  • Delivery Drivers
  • Professional Drivers

This guide includes:

  • Welcome Letter
  • Important Contacts
  • Administrative Procedures
    • Induction
    • Training
    • Code of Conduct
    • Reporting Procedures
    • Electronic Devices
    • Seatbelts
    • Passengers
    • Licences
    • Work Diaries and Documentation
    • Fuelling
  • Workplace Health & Safety
    • Entering/Exiting Vehicle
    • Low risk driving
    • Maintenance of vehicle
    • Housekeeping
    • Smoking
    • Vehicle Accident or Breakdown
    • Animals
    • Load Restraints
    • Hazardous Chemicals
  • Work Health & Safety Policies
    • WHS Policy
    • Safe Driving Plans Policy
    • Drugs and Alcohol Policy
    • Fatigue Management Policy
    • Managing the Risk of Falls at Workplaces Policy
    • Hazardous Manual Tasks Policy
    • Pre-Operation Inspection Policy and Checklist
  • Glossary
  • Relevant Worker Policy Agreement
 

Drivers Manual Information:

This 23 page Drivers Manual has been developed to provide guidance and information for Drivers to assist in the prevention of injury or illness.

Road accidents are the cause of most fatalities in the road transport industry, and Drivers fatigue is often a factor. Workers have also been killed or seriously injured after falling from the top of their trucks while loading, checking or securing goods. More than 80% of severe injuries among road transport workers, however, are sustained while not driving. Most of these injuries are the result of manual handling, slips, trips and falls and being injured during loading/unloading practices involving forklifts.

Product Details:

  • 23 Page Document
  • Written by ex WHS inspectors
  • Referenced
  • MS Word format NOT PDF
  • Employee sign off section
  • Instant download delivery
This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.