Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Fibre Optic Splicing (External) SWMS

Fibre Optic Splicing (External) SWMS

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Instant Download Delivery

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency ProceduresReview
  • References

The External Fibre Optic Splicing  Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the splicing/joining of fibre optic cabling.

This Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

It provides guidance on Fibre Optic cable splicing/ joining. This SWMS covers the planning and preparation of the activity and operation involved with repairing, splicing or building a new joint in fibre optic cabling adjacent to roads and, subsequent placement in a pit or manhole.

This SWMS does not cover work carried out near or in a Confined Space.

A dedicated SWMS addressing these items must be put in place if applicable and used in conjunction with this SWMS.

It can be used as part of your WHS inductions, for Tool box talks or tender applications.

Product Details

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Review Date: 14 March 2014

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Fibre Optic - Termination
  • Power Tools
  • Traffic Management Plan
  • LOTO – Lock Out Tag Out

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.