Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Fibre Optic - Termination SWMS

Fibre Optic - Termination SWMS

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Instant Download Delivery

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

The Fibre Optic - Termination Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for Fibre Optic cable run in and termination.

The Fibre Optic – Termination Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This Safe Work Method Statement (SWMS) provides guidance on Fibre Optic cable run in and termination. This SWMS covers the planning, preparation and operation and emergency procedures involved with running fibre optic cable into a premises and terminating at a wall cabinet.

This SWMS does not cover work carried out near or in a Confined Space or working at heights.

A dedicated SWMS addressing these items must be put in place if applicable and used in conjunction with this SWMS or this SWMS modified to suit.

The Fibre Optic - Termination Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.
Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Review Date: 14 March 2014

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Ladder Safety
  • Scissor Lift
  • Power Tools

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.