Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Food Van - Mobile SWMS

Food Van - Mobile SWMS

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Instant Download Delivery

Product Details:

  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Review Date: 14 March 2014

Catering Van - Mobile Food Van Information:

The Catering Van Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure outlining the safety steps for the use of a mobile catering van.

This Mobile Food Van Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers general safety issues associated with the use of a Mobile Catering Vehicle (towed or self-propelled). This does not include any reference to food safety standards.

Ensure a site-specific SWMS is developed for site and task-specific hazards, including electricity or gas supply and use of fuel-powered generators.

Main hazards include:

  • Electric shock
  • Fire / explosion
  • Heat / Burns (including steam)
  • Lacerations
  • Violence
  • Musculoskeletal Disorders (MSD) from hazardous manual tasks
  • Vehicle accident
  • Hit by moving vehicles
  • Slips, trips, falls 

The Catering Van SWMS can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Catering Van - Mobile Food Van SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Plan
  • Review
  • References

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.