Loading... Please wait...
  • Fuel Storage, Handling and Decanting SWMS

Fuel Storage, Handling and Decanting SWMS


Brand: SafetyCulture

Instant Download

Product Description

Instant Download Delivery

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
This SWMS includes:
  • Risk Assessment
  • Check Container
  • Check Safety Equipment and Procedures
  • Store Container
  • Decant Fuel
  • Shut Down
  • Emergency Procedures
  • Risk Ratings

This Safe Work Method Statement outlines the Safety Steps required to Store, Handle and Decant Fuel Safely.

Fuel Storage, Handling and Decanting needs to be approached with caution and appropriate safety procedures. This Safe Work Procedure is Not A Blank Template. Safety Procedures can be edited or customised in MS Word if required.

When Storing, Handling and Decanting Fuel:

  • No smoking or naked flames near the fuel.
  • Do not inhale vapour
  • Read material safety data sheet for the fuel.
  • Do not attempt to lift container manually.
  • Have an appropriate funnel available.
  • Check for leaks.

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.