1762251C1A0FFF7DCD4A2317E72D9B7A
 Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Industrial Rope Access SWMS

Industrial Rope Access SWMS

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Instant Download Delivery

The Industrial Rope Access Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps for the use of rope access systems.

This Safe work Method Statement (SWMS) provides guidance on industrial rope access systems used for gaining access to, and working at a workface, usually by means of vertically suspended ropes (can be horizontal – such as under bridge work). Other methods of accessing a work face should be considered (for example, EWPs or building maintenance units) before rope access systems, as a high level of skill is essential for their safe use.

This SWMS does NOT deal with permanent rope access structures/anchor points that will be left in place, or purpose built suspension rigs. 

Main hazards:

-       Rope or equipment failure
-       Falls
-       Failure to rescue in a timely manner

Work involving a risk of a person falling more than two metres, is defined as “High Risk construction Work” by Work Health and Safety Regulations 2011.

 This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

Related items:

  • Manual Handling – Hazardous Manual Tasks

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.