Loading... Please wait...
  • Mower - Ride On Front Deck SWMS

Mower - Ride On Front Deck SWMS

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Instant Download Delivery
Product Details:
  • 4 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

The four page Safe Work Procedure outlines the Safety Steps required to operate a Ride On MowerSafely. Ride On Mowers need to be used with caution and appropiate safety procedures. The Ride On Mower - Front Mounted Cutting Desk procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

The Mower - Ride On Front Deck Safe Work Method Statement includes:

  • Operation Requirements
  • Awarenss
  • General Safety
  • Refuelling
  • Daily Pre-Start Checks
  • Comencing
  • Operating
  • Completion
  • Transportation
  • Weekly Maintenance
  • Risk Ratings

Ride On Mower Safety Notes 

When Operating A Ride On Mower with a Ride Mounted Cutting Deck:

  • Ensure the mower is on a flat surface and turned off before refuelling.
  • Always mow during the day.
  • Mow with the engine running at full throtal.
  • Never leave the mower while it is turned on.
  • Reverse onto trailer, or truck.

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.