Loading... Please wait...
  • Portable Toilet SWMS

Portable Toilet SWMS


Brand: SafetyCulture

Instant Download

Product Description

The Portable Toilet Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the cleaning and transportation of portable toilets.

The Portable Toilet Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers cleaning, pump-out of portable toilets and addition of cleaning/deodorising chemicals to the toilet tank. This also deals the general hazards associated with loading/unloading and transfer of portable toilets using a truck-mounted crane. Ensure site/task-specific SWMS are developed for hazards not covered in this SWMS.

Main hazards include:

  • Exposure to biological cotangents (raw sewerage and waste products)
  • Musculoskeletal Disorder (MSD) from hazardous manual tasks
  • Noise
  • Exposure to hazardous chemicals
  • Environmental impacts:
  • Contamination
  • Noise

This SWMS includes the following “High Risk Construction Work" as defined by Work Health and Safety Regulations 2011:

  • Possible live electricity
  • Mobile Plant
  • Working with flammables

The Portable Toilet Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.
The Portable Toilet SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Review Date: 14 March 2014
  • Instant download delivery

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Contact with Utilities
  • Hiab Crane or Truck Loading Crane
  • Traffic Management Plan

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.