Loading... Please wait...

Fully Completed Safety Documents For The Construction IndustryRequest a Quote Here!

  • Quad Bike SWMS

Quad Bike SWMS

$79.95

Brand: SafetyCulture

Availability:
Instant Download
Quantity:

Product Description

Instant Download Delivery
The Quad Bike Work Method Statement SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Clean-up & Maintenance
  • Emergency Procedures
  • References
Product Details:
  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery
The Quad Bike - Operation of Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure.  
Quad bikes or All Terrain Vehicles (ATV’s) can be dangerous and can easily roll over. Each year, more than 12 Australians are killed in ATV incidents, many of these are children. The term “All Terrain Vehicle” can be misleading, as these vehicles do have limitations and CANNOT be operated on all terrain – such as slippery surfaces, steep slopes etc. The manufacturer’s operating manual MUST be read before any person operates an ATV. Persons under 16, or persons with a small frame, should not operate industrial sized ATVs. 
A working party has been established to investigate suitability of installing Roll Over Protection (ROPs) and operator restraints on ATVs.
The Quad Bike Safe Work Method Statement is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 
The Quad Bike Work Method Statement can be used as part of your OHS inductions, for tool box talks or tender applications.
 

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.