Loading... Please wait...
  • Remote Isolated Work

Remote - Isolated Work SWMS


Brand: SafetyCulture

Instant Download

Product Description

The Remote – Isolated Work Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for working in isolation (alone).

The Remote - Isolated Work, Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Emergency situations may arise because of the sudden onset of a medical condition; work-related injury or disease; attack by an animal; exposure to the elements; or by becoming stranded without food or water. The consequences are potentially fatal for people 'working alone' and unable to get immediate assistance from colleagues or other people.

The Remote - Isolated Work, Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.
The Remote - Isolated Work SWMS includes:

  • PPE
  • Safety Notes
  • Personnel Requirements
  • Planning
  • Working
  • Completion
  • References

Product Details:

  • Minimum7 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Heat Stress
  • Remote Area Work Guide
  • Remote Area Four Wheel Driving

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.