Loading... Please wait...
  • Solar Panel Installation - Grid Connection SWMS

Solar Panel Installation - Grid Connection SWMS


Brand: SafetyCulture

Instant Download

Product Description

Instant Download Delivery

Product Details:

  • 16 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Solar Panel Installation - Grid Connection Information:

The Solar Panel Installation - Grid Connection Safe Work Method Statement (SWMS) is a comprehensive 16 page procedure outlining the safety steps for the installation of solar panels.

The Solar Panel Installation - Grid Connection Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This SWMS covers risks associated with general installation of solar panels (on-grid) on a roof. Ensure the manufacturer's installation manual/guide is available for specific information on all installation works.

Main risks:

  • Falls from height
  • Electrocution/electrical shock
  • Exposure to harmful atmospheres (asbestos, silica, etc)
  • Musculoskeletal Disorder (MSD) from hazardous manual tasks

The Solar Panel Installation Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Solar Panel Installation - Grid Connection Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Installation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Related Products:

  • Manual Handling - Hazardous Manual Tasks
  • Heights (Safe Working At)
  • LOTO - Lock Out Tag Out
  • Roofs - Safe Working on Roofs
  • Asbestos Safety - Working in Roofs
  • Traffic Management Plan


This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.