Loading... Please wait...
  • Storm Water Drains Vacuumation SWMS

Storm Water Drains Vacuumation SWMS


Brand: SafetyCulture

Instant Download

Product Description

Instant Download Delivery
The Storm Water Drain - Vacuumation Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre- Operational Inspection
  • Operation
  • Waste Disposal
  • Emergency Procedures
Product Details:
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Product Description
  • PDF Downloads
The Storm Water Drain - Vacuumation Safe Work Method Statement (SWMS) is a comprehensive procedure. This SWMS covers the cleaning of storm water drains using vacuumation processes. Where entry into drain system is required, an assessment must take place to determine whether the area is a “confined space”. 
If a confined space is determined, use SafetyCulture's Confined Space Entry SWMS. This SWMS does not cover confined space entry. 
This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 
The Storm Water Drain - Vacuumation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.