Loading... Please wait...
  • Stump Grinder SWMS

Stump Grinder SWMS


Brand: SafetyCulture

Instant Download

Product Description

Instant Download Delivery

The Safety Procedure includes:

  • Risk Assessment
  • Being Prepared
  • Pre-start Checks
  • Operating
  • Completion
  • Transporting
  • Emergencies
  • Risk Ratings
  • 4 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template

General Stump Grinder Safety Information:

The seven page Safe Work Procedure outlines the Safety Steps required to operate Stump Grinders Safely.

Stump Grinders need to be used with caution and appropiate safety procedures. The Stump Grinder procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

Before Operating Stump Grinders:

  • Review all safety decals.
  • Confirm all the guards are in place in good condition.
  • Make sure the engine is stopped before refueling.
  • If there is a leak in the fuel system the engine must not be started until resolved.
  • The break is in lock position.

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.