Loading... Please wait...
  • Underground Services - Locating - Air SWMS

Underground Services - Locating - Air SWMS


Brand: SafetyCulture

Instant Download

Product Description

Instant Download Delivery

The Underground Services – Locating – Air Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the use of compressed air to locate underground services.

The Underground Services – Locating – Air Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

This Safe Work Method Statement (SWMS) provides guidance on conducting compressed air excavation (Pot-holing) for underground service locating. This SWMS covers the planning and preparation of the activity, transport of a trailered diesel compressor, equipment and Utilitrac vacuum unit, Safe setup and operation of all equipment, maintenance, review and emergency management procedures.

Any work associated with excavation is considered construction work under S289 (2) (f) of the Work Health and Safety Regulations 2011. Section 291 (a–r) further defines ‘high risk construction’ tasks that require a Safe Work Method Statement to be in place before commencing activity.

This SWMS does not cover in detail the following:

  • Work that involves the disturbance of Asbestos
  • Work carried out near or in a Confined Space
  • Work that may be carried out near Pressurised Gas distribution mains
  • Work carried out near Energised Electrical services
  • Work carried out on or near to a road, rail or other traffic corridor

A dedicated SWMS addressing these items must be put in place if applicable and used in conjunction with this SWMS

(Note: this list may not be inclusive and reference must be made to Section 291 (a –r) of the WHS Regulation 2011)

The Underground Services – Locating – Air Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

The Underground Services – Locating – Air SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Transport
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Product Details

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Review Date: 14 March 2014

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Confined Spaces
  • Traffic Management Plan
  • LOTO – Lock Out Tag Out

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states in Australia.