Loading... Please wait...
  • Wacker Packer SWMS

Wacker Packer SWMS


Brand: SafetyCulture

Instant Download

Product Description

Instant Download Delivery

The Safety Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Planning & Pre-Start Checks
  • Re-Fuelling
  • Starting
  • Operating
  • Completion
  • Transportation
  • Long Term Storage
  • Risk Ratings
  • Review Date: 14 March 2014
  • MS Word Format
  • This Is Not A Blank Template
  • Product Description

General Wacker Packer Safety Information:
The three page Safe Work Procedure outlines the Safety Steps required when operating a Wacker Packer.

Wacker Packers need to be used with caution and appropriate safety procedures. The Wacker Packer procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

This document has been developed and provided by SafetyCulture Pty Ltd and is offered for sale by ACRIS Services who are licensed resellers for Australia. SafetyCulture employ former WorkSafe Inspectors to research and write documents ensuring safe work practices can be understood and followed by employees performing high risk activities in the course of their duties. SafetyCulture's mission is to make Safety A Way Of Life for workers across the world by providing documentation through software and printable files.

SWMS - Safe Work Method Statement

Safe Work Method Statements (SWMS) are required for any high risk activity that is performed by an employee in the workplace. Each document must identify the risks involved when performing the activity, a risk rating for each risk, a safe work method to perform the activity and a residual risk rating for the risks. SafetyCulture SWMS comply with current WH&S legislation in all states across Australia. This document is fully completed with a step by step procedure that can be edited and appended. This is not a blank template, it is a comprehensive procedure that has been researched and developed by a qualified writer.